Research Projects
Ongoing Projects
[1]Research on incomplete data driven cognitive control method for engineering-to-order
assembly system,supported by National Natural Science Foundation of China
(Grant no. 51975373).
[2]Research on key technologies and theories of cyber-physical production system for
customization products, supported by the National Key R&D Program of China
(Grant no. 2018YFB1700500)
[3]Research of big data driven analysis and decision making technology for smart factory,
supported by National Natural Science Foundation of China (Grant no. 51435009).
Completed Projects
[1]Research on methods for stochastic assembly line rebalancing problem with time and space coupling constraints,supported by National Natural Science Foundation of China (Grant no. 51475303).
[2]Based on decomposition algorithm for a large-scale two-sided assembly line balancing problem with multi-objective, supported by National Natural Science Foundation of China (No.71001065)
[3] Research & application of balancing algorithms for a large-scale two-sided assembly line, supported by Research Fund for Doctoral Program of Higher Education (No. 200802481112)
[4] Research on multi-objective assembly line balancing algorithms for a large-scale two-sided assembly line, supported by Shanghai Municipal Natural Science Foundation (09ZR1414100)
[5] Research on polymorphic modeling methods for a complex manufacturing system, supported by National 863 Program (No. 2007AA04Z109).
[6] Research on hierarchical adaptive control for a re-entrant manufacturing system, supported by National Natural Science Foundation of China (No. 050575137)
[7] Research on manufacturing logistic management of shipyard enterprises, supported by Shanghai Municipal Science & Technology Commission (No.04DZ11004)
[8] Key technology research & application demonstration of production lines for equipment manufacturing enterprises, supported by Shanghai Municipal Science & Technology Commission ( No. 03111005)
Selected Publications
[1]Xiaofeng Hu, Jiafu Wan, Data-Driven Reallocation of Workers in Engineering-to-Order Assembly Islands: A case study, IEEE Access, 2019, 7:68734-68741.
[2] Hu Xiaofeng, Wu Chuanxun, Zhang Yahui, Workload smoothing in two-sided assembly lines, Assembly Automation, 2018, 38(1): 51-56.
[3] Hu Xiaofeng, Wu Erfei, Jin Ye, A station-oriented enumerative algorithm for two-sided assembly line balancing, European Journal of Operational Research, 2008, 186(11):435-440.
[4] Hu Xiaofeng, Bao Jinsong, Wu Er-fei, Jin Ye, A branch and bound algorithm to minimize the line length for two-sided assembly line balancing problem, European Journal of Operational Research, 2010, 206(3): 703-707
[5] Hu Xiaofeng, Bao Jinsong, Jin Ye, Minimizing makespan on parallel machines with precedence constraints and machine eligibility restrictions, International Journal of production Research., 2010,48(6):1639-1651.
[6] Hu Xiaofeng, Bao Jingsong, Jin Ye, A tabu search algorithm for a pipe-processing flowshop scheduling problem minimizing total tardiness in a shipyard, Asia-Pacific Journal of Operational Research, 2009, 26(6): 817-829.
[7] Hu Xiaofeng, Ye Qingtai, Adaptive thresholding for degraded call number images, IEICE Transaction on Information and Systems, 2005, E88-D(1):162-163.
[8] Hu Xiaofeng, Zhou Yong, et al, Automatic call number localization in color book images, Journal of Electronic Imaging, 2005,15(4):043017-1~6.
[9]Yingchao Liu, Xiaofeng Hu, Wenjuan Zhang, Remaining useful life prediction based on health index similarity, Reliability Engineering and Safety System, 2019, 185:502-510.
[10] Zhang Yahui, Hu Xiaofeng, A modified multi-objective genetic algorithm for two-sided assembly line re-balancing problem of a shovel loader, International Journal of Production Research, 2018, 56(9): 3043-3063.
[11] Liu Yinchao, Hu Xiaofeng, Tool condition monitoring and degradation estimation in rotor slot machining process, International Journal of Advanced Manufacturing Technology, 2016, 91 (1-4): 39-48.