代表性论文专著
1) Chengen Wang, A multidisciplinary design and analysis environment and its application to aircraft flight dynamics analysis. Journal of Industrial Information Integration, vol. 1, 14-19, March 2016.
2) Chengen Wang, DataView: a Computational Visualization System for Multidisciplinary Design and Analysis. Enterprise Information Systems, 10(1), 33-49, 2016.
3) Qiang Liu, Chengen Wang, A Graph-based Pipe Routing Algorithm in Aero-engine Rotational Space. Journal of Intelligent Manufacturing, 26(6), 1077-1083, 2015.
4) Chengen Wang, Zhuming Bi, Lida Xu, IoT and Cloud Computing in Automation of Assembly Modeling Systems, IEEE Transactions on Industrial Informatics, 10(2), 1426-1434, 2014. DOI 10.1109/TII.2014.2300346.
5) Zhuming Bi, Lida Xu, and Chengen Wang, Internet of Things for Enterprise Information Systems of Modern Manufacturing, IEEE Transactions on Industrial Informatics, 10(2), 1537-1546, 2014. DOI 10.1109/TII.2014.2300338.
6) Lida Xu, Chengen Wang, Zhuming Bi, Yu Jiapeng, Object-Oriented Templates for Automated Assembly Planning of Complex Products. IEEE Transactions on Automation Science and Engineering, 11(2), 492 - 503,2014. DOI 10.1109/TASE.2012.2232652
7) Chengen Wang, Insights from Developing an MDO Environment for Complex Engineering Systems. Computers in Industry, 65 (4), 786–795, 2014. doi 10.1016/j.compind.2014.02.015
8) Chengen Wang, Integrated Aerodynamic Design and Analysis of Turbine Blades, Advances in Engineering Software, 68, 9-18, 2014.
9) Yu Jiapeng; Xu Lida; Bi Zhuming; Chengen Wang, Extended Interference Matrices for Exploded Views of Assembly Planning. IEEE Transactions on Automation Science and Engineering, 11(1), 279 - 286, 2014.
10) Yu Jiapeng, Chengen Wang,Method for discriminating geometric feasibility in assembly planning based on extended and turning interference matrix. International Journal of Advanced Manufacturing Technology, 67 (5-8), 1867-1882,2013.
11) Yu Jiapeng,Chengen Wang, A max-min ant colony system for assembly sequence planning. International Journal of Advanced Manufacturing Technology, 67 (9-12), 2819-2835, 2013.
12) LiDa Xu; Chengen Wang; Zhuming Bi; Jiapeng Yu, AutoAssem: An Automated Assembly Planning System for Complex Products. IEEE Transactions On Industrial Informatics, 8(3), 669-678, 2012.
13) Chengen Wang, Advances in information integration infrastructures supporting multidisciplinary design optimization. Enterprise Information Systems, 6(3 ), 265-265, 2012.
14) Qiang Liu; Chengen Wang, Multi-terminal pipe routing by Steiner minimal tree and particle swarm optimization. Enterprise Information Systems, 6(3), 315-327, 2012.
15) Zhangjun Huang, Chengen Wang, Optimal Design of aeroengine turbine disc based on Kriging surrogate models. Computers and Structures, 89(1-2), 27-37, 2011.
16) Qiang Liu, Chengen Wang, A discrete particle swarm optimization algorithm for rectilinear branch pipe routing. Assembly Automation, 31(4), 363-368, 2011.
17) Chengen Wang, Qiang Liu, Projection and Geodesic based Pipe Routing Algorithm. IEEE Transactions on Automation Science and Engineering, 8(3) 641-645, 2011.
18) Chengen Wang, Yu Hong, Zhang Wenlei. Object-oriented Models for Aero-engine Assembly. International Journal of Internet Manufacturing and Services, 2( 3/4), 354-364, 2010.
19) Qiang Liu, Chengen Wang, Pipe-assembly approach for aeroengines by modified particle swarm optimization. Assembly Automation, 30(4), 365-377, 2010.
20) Wuliang Peng, Chengen Wang, A multi-mode resource-constrained discrete time-cost tradeoff problem and its genetic algorithm based solution. International Journal of Project Management, 27(6), 600-609, 2009.
21) Jiapeng Yu, Chengen Wang, et al., Generation of Optimized Assembly Sequences Based on Priority Rules Screening. Applied Mechanics and Materials. 2009,16-19:130-134.
22) Guoqi Feng, Dongliang Cui, Chengen Wang, et al.,Integrated data management in complex product collaborative design. Computers in Industry, 60(1), 48-63, 2009.
23) Zhangjun Huang, Chengen Wangand Mingxu Ma, A Robust Archived Differential Evolution Algorithm for Global Optimization Problems. Journal of Computers, 4(2), 160-167, 2009.
24) Tao Ren; Chengen Wang; Luo Xiaochuan; Jing Yuanwei; Dimirovski Georgi M, Robust controller design for ATM network with time-varying multiple time-delays. International Journal of Innovative Computing, Information and Control, 5(8), 2341-2349, 2009.
25) Chengen Wang, Xu Lida, Parameter mapping and data transformation for engineering application integration. Information Systems Frontiers, 10(5), 589-600, 2008.
26) Chengen Wang, Lida Xu, Wuliang Peng, Conceptual Design of Remote Monitoring and Fault Diagnosis Systems, Information System, 32 (7), 996–1004, 2007.
27) Qilin Shu and Chengen Wang, A conceptual framework for product lifecycle modeling. Enterprise Information System, 1(3), 353–363, 2007.
28) Xiao Liu; Feng Chu; Chengbin Chu; Chengen Wang, Lot Sizing with Bounded Inventory and Lost Sales. International Journal of Production Research, 45(24): 5881-5894, 2007.
29) Lida Xu, Chengen Wang, et al., Integrating Knowledge Management and ERP in Enterprise Information Systems, Systems Research and Behavioral Science, 23(2), 147-156, 2006.
30) Xiaochuan Luo, Chengbin Chu, Chengen Wang, Some dominance properties for single-machine tardiness problems with sequence-dependent setup, International Journal of Production Research, 44(17), 3367-3378, 2006.
31) Guoqi Feng, Chengen Wang, Haiyue Li, Web Services Based Cross-Organizational Business Process Management. Lecture Notes in Computer Science, Vol. 3399, pp. 548-559, 2005, Springer-Verlag GmbH.
32) Chengen Wang, Lida Xu, Xuwei Qin, ERP research, developments and implementations in China: an overview. International Journal of Production Research, 43(18), 3915–3932, 2005.
33) Chengen Wang, Yu Zhang, et al., An integration architecture for process manufacturing systems, International Journal of Computer Integrated Manufacturing, 15(5), 413-426, 2002.
34) Chengen Wang, Chengbin Chu, Caowan Yin. Implementation of Remote Robot Manufacturing over Internet. Computers in Industry, 45(3), 215-229, 2001.
35) Chengbin Chu, Jean-Marie Proth and Chengen Wang, Improving job-shop schedules through critical pairwise exchanges. International Journal of Production Research, 36(3), 683-694, 1998.
36) Chengen Wang, Chengbin Chu and Jean-Marie Proth, Heuristic Approaches for n/m/F/SCi Scheduling Problems. European Journal of Operation Research, 96(3), 636-644, 1997.
37) Chengen Wang, Chengbin Chu and Jean-Marie Proth, Efficient Heuristic and Optimal Approaches for n/2/F/Ci Scheduling Problems. International Journal of Production Economics, 4(3), 225-237, 1996.
38) Jingsong Xue, Chengen Wangand Mu R., Progress in the Journey Developing SB-CIMS. International Journal of Computer Integrated Manufacturing, 7(4), 242-248, 1994.
39) Chengen Wang, Jianying Zhu and Zhongxin Wei, An Expert System for FMS Control. International Journal of Intelligent Systems Engineering, 2(4), 223-230, 1993.